Sri Rahayu, Y., and F. Rachmawati. “Root Cause Analysis of Delays in The XYZ Toll Road Design and Construction Project Using the RCA Method”. Journal of Management Economic and Financial, vol. 3, no. 6, Dec. 2025, pp. 5694-06, doi:10.59261/jmef.v3i6.181.