[1]
Y. Sri Rahayu and F. Rachmawati, “Root Cause Analysis of Delays in The XYZ Toll Road Design and Construction Project using the RCA Method”, jmef, vol. 3, no. 6, pp. 5694–5706, Dec. 2025.