Sri Rahayu, Y., & Rachmawati, F. (2025). Root Cause Analysis of Delays in The XYZ Toll Road Design and Construction Project using the RCA Method. Journal of Management Economic and Financial, 3(6), 5694–5706. https://doi.org/10.59261/jmef.v3i6.181